RFQ for Chinese Manufacturers: What to Include

Make manufacturer quotes comparable with checkable specifications, common commercial assumptions, separate alternatives and structured replies.

An RFQ is a way to make different suppliers answer the same purchasing question. Length alone does not improve it. The specification, quantity and delivery boundary must be clear; unknowns become questions and alternatives remain separate from the base offer. This guide explains how to design the inquiry. Use the supplier RFQ template for the fillable fields.

Turn intended use into checkable requirements

State the use, target users, destination market and revision of the reference image or drawing. Then specify the dimensions, materials, functions and quality requirements that determine whether the product works. Replace phrases such as “premium quality” or “exactly like the photo” with observations that can be checked on a sample. For unseen construction, material grade or performance, request a proposed solution and supporting rationale rather than letting each factory silently assume something different.

Separate fixed conditions from alternatives

Mark must-have conditions, areas where price or timing can be traded, and undecided items. Ask suppliers to answer whether they can meet the base requirement first. Alternative materials, existing tooling or different packing belong on separate lines with differences, sample implications and prices. Otherwise a lower unit price may describe a different product rather than a better offer.

Hold commercial assumptions constant

Give meaningful quantity tiers, sample quantity, expected repeat rhythm, packing, target timing and delivery location. Ask for currency, validity, payment milestones, MOQ and whether samples, tooling, setup, testing, packing, freight and taxes are included. If an Incoterms® rule is used, name the rule, specific place and edition. Three letters without a place can leave cost and handoff ambiguity; see the ICC Incoterms® 2020 Q&A.

Require a structured supplier response

Provide a met, deviation or pending field for each requirement. Put each charge on a separate line with amount, unit, currency and whether it is included in unit price. Ask for the actually offered specification, sample revision behind the quote, when lead time starts, buyer approvals needed and explicit exclusions. A blank charge is not free, and an absent test document does not prove destination-market compliance.

Use clarification rounds to make offers comparable

After the first responses, do not rank by unit price. Flag specification changes, missing charges, different delivery points and quote validity. Send the same clarifying questions to candidates that remain viable. Retain the original and revised offers; a single overwritten PDF destroys the reasoning trail. The conclusion should say under which conditions one offer costs less, not merely name the lowest number.

Keep the result of the RFQ

Archive the current brief, original responses, deviations and charge comparison, clarification log, sample plan and owner for unresolved issues. A quote does not prove factory identity, capacity or product compliance; samples and supplier checks follow. If FindBao is asked to assist with inquiries and quote comparison, read the service scope and agree deliverables and fees before starting.